Site Observation Points
Contact No.: 01787912497
1. STP / Plant Room
Pipe supports are required.
Flow direction indicators are required.
Base/ball valve fixing needs to be checked. (Handwriting unclear.)
The plant room needs to be cleaned.
Lighting is required.
Internal painting is required.
DB and pump load/DP need to be checked. (Exact wording unclear.)
Pipe bases/supports are required on the inside and outside, including brackets/angles. (Verify on site.)
2. Roof
Gratings are required.
Rainwater line connection is required. (Quantity/connection detail to be confirmed.)
Existing holes need to be sealed.
The RCC roof surface, beams and slab faces need to be cleaned.
Water pipeline routing needs to be checked. (The remaining handwritten text is unclear.)
3. Level 12 (L-12)
Toilet and basin connection pipes need to be checked.
Gate/ball valve operation needs to be checked.
Check the relevant valve/pipe connections and operational status. (Final handwritten instruction is unclear.)
4. Level 11 (L-11)
Lighting is required in the DB duct/lobby area. (Confirm the exact location.)
Room/area reference: 1001 — further details to be confirmed.
Bolt/bolting work is required. (Exact item and location are unclear.)
5. Other Levels
L-14, L-13 and L-12: Further inspection items to be confirmed from the original site notes.
General Instruction: Verify all unclear items at the site before executing the work.